Stormwater Improvement Project


Client / Location

ESM, Inc. / Braintree, MA

Services Provided

  • Existing utility mapping
  • Site and utility survey
  • Stormwater flow evaluations
  • Surface re-grading design
  • Storm drain relocation design
  • Construction material selection
  • Design specifications and drawings
  • Cost estimates
  • Basis of Design Report
  • Construction supervision and field oversight

This Storm Water Improvement Project was under taken as a component of an agreement between the land owner and a national petroleum distribution company as a result of a release of petroleum hydrocarbons at the site. The objective of the project was to improve storm water management systems within the release area to eliminate infiltration of petroleum into the system and preferential migration of petroleum along the system pathway. To the degree possible, improvements were also designed to provide sufficient grading to allow for free flow of storm water runoff from the project area, to minimize standing water within the drainage area serviced by system improvements, and to eliminate flooding and to allow for full use of existing buildings and paved areas.

Project Duration

2003 - 2006

Project Value

$225,000